TrailScapes Pty Ltd

Projects


For more information about any of our current or past projects or to view a map or the image gallery of a particular project, please follow the links below. If you have any questions or would like to contact TrailScapes Pty Ltd about a project, please Contact Us.

trail builder australia international

Fox Creek Lone Gum DH track and Gravity Enduro trail

Client Forestry SA, Bicycle SA

Date April to August 2017

TrailScapes completed the construction of the country’s most exciting downhill trail. A first in Adelaide, the Lone Gum DH trail starts at the very top of Fox Creek, where a lone giant gum sits on top of the hill, overlooking the valleys below. The trail is a mixture of off […]

More Information »

Mitcham trails upgrades and construction

Client City of Mitcham

Date August 2010 to current

TrailScapes has been a preferred contractor for trail design, construction and repairs within the Mitcham Council for many years. Our team has carried out upgrades to mountain bike trails as well as walking and shared-use trails and has constructed many new trails and new sections of trails. Works include: the […]

More Information »

China TrailScapes DH trail building 2X racing Elliot Smith Aiden Varley

GuiDe National Geopark DH and 2X courses, Xining, China

Client GuiDe National Geopark, Guide County, China

Date July - August 2017

Our company was contracted to improve and extend a couple of existing trails at Guide National Geopark, 100km from Xining in the province of Qinghai in China in preparation for the 2017 TDRY GuiDe Geo Park International Downhill Race. The race consist of two events raced on separate courses; the Downhill course […]

More Information »

Manly Dam, Sydney, NSW

Client Warringah Council

Date June 2017 - May 2015 to June 2015 - June 2014 to November 2014

Manly Dam is the most used trail in Australia, with approximately 150,000 uses a year, and up to 500 passes in one day. TrailScapes were contracted by Warringah Council to carry out maintenance to the iconic 10 kms loop, replacing old timber structures with locally sourced sandstones, constructing A and […]

More Information »

Bendigo MTB Skills Park, VIC

Client City of Greater Bendigo

Date May 2017

Our team designed and constructed a fun MTB Skills Park incorporating drops, log roll-over, boardwalks, wall-ride and other features to test riders’ skills.

More Information »

Pump track Bendigo TrailScapes

Spring Gully (Bendigo) pump track construction + skills park design, VIC

Client City of Greater Bendigo

Date February 2017

TrailScapes constructed one of the country’s biggest pump track in Spring Gully using over 1,000 tons of dirt for the City of Greater Bendigo and Bendigo Mountain Bike Club. The pump track is now awaiting asphalt on the berms and TrailScapes is also helping to design a skills loop around the […]

More Information »

pump track trailscapes brighton

Brighton Pump Track, SA

Client City of Holdfast Bay

Date January 2017

Our team constructed a pump track for the City of Holdfast Bay in January 2017 on a long and narrow plot alongside the train line in Brighton, a seaside suburb of Adelaide. The main track include 2 very long straights and plenty of berms! There is also a smaller beginner pump […]

More Information »

Lysterfield Mountain bike trail network upgrade, VIC

Client Parks Victoria

Date November - December 2016

Towards the end of 2016, TrailScapes was contracted by Parks Victoria to carry out upgrades to the network of Mountain bike trails at Lysterfield, Melbourne. Our team improved flow, drainage, cleared overgrown vegetation and built or rebuilt features on a number of trails and rock armoured sections of trails. The […]

More Information »

Castle Cove Jumps, Sydney, NSW

Client Willoughby City Council

Date May to October 2016 from design to construction

A small Council reserve nestled in the beautiful suburb of Castle Cove has been the home of some of the country’s oldest and most famous dirt jumps in Australia. When these jumps eventually fell into disrepair, TrailScapes was asked to design and rebuild a low-maintenance facility that would cater for the […]

More Information »

Cobbler Creek Recreation Park Slopestyle course and pump track, SA

Client DEWNR South Australia

Date May to November 2016

Cobbler Creek Recreation Park recently received a major upgrade with the installation of a playground, bbq, toilets, etc. Our team was chosen to design and construct a first in South Australia; a slopestyle course incorporating structures such as steel and wooden kickers, the whale tail jump and a wall-ride. The […]

More Information »

trail building extremely rocky terrain

Mount Remarkable Summit Trail

Client Department of Environment, Water and Natural Resources (SA)

Date March to August 2016

Our team completed the design and construction of a new section of trail approximately 8km long between Mount Remarkable Summit and the historic township of Melrose, in a part of the National Park that was previously inaccessible. The Mount Remarkable loop starting in the township now provides users with a […]

More Information »

Jump ramps TrailScapes

Melrose pump track and timber jumps ramps

Client The town of Melrose

Date April 2016

While working on the Mount Remarkable Summit trail, our team donated time and money to rebuild an existing pump track and install timber jump ramps in the iconic country town of Melrose, Southern Flinders Ranges in South Australia. The beginner jump ramp allows even the youngest or less experienced riders […]

More Information »

Red Hill Bike Skills Park, Mornington Peninsula

Client Mornington Peninsula Shire

Date April - August 2016

TrailScapes was given the opportunity to design and construct a bike Skills Park on the beautiful Mornington Peninsula, South of Melbourne. The result is a high quality facility that cramps a lot in a small Council Reserve; beginner to intermediate jumps, berm/wallride, drops, skinny boardwalks, rock armoured pinch climb, trial’s […]

More Information »

Elliston Coastal Trail Elliston

Elliston Coastal Surfaced Trail

Client District Council of Elliston

Date 16 January - 26 February 2016

TrailScapes recently completed the construction of a new surfaced trail through the dunes and stunning limestone cliff tops of Elliston on the Eyre Peninsula in South Australia. The 900mm (through sensitive areas) to 1.2 metre wide surfaced path offers visitors a scenic walk through coastal vegetation and sand dunes while […]

More Information »

Asia Pacific Downhill Challenge Track, Bali, Indonesia

Client United Bikes - Indonesia

Date October 2013 - October 2014 - October 2015

Three years ago, TrailScapes was contracted by United Bike (the largest Indonesian bike manufacturer) to design and co-ordinate the build of a downhill race course of international standard on the island of Bali, in Indonesia to hold the annual Asia Pacific Downhill Challenge. Set on a very steep hill in […]

More Information »

Best pump track jumps trailscapes shepherds hill

Shepherds Hill Recreation Park, Adelaide

Client Department of Environment, Water and Natural Resources, SA

Date June 2015 - September 2015

Our team recently completed revamping old singletracks in this Reserve.This heavily used suburban reserve was crying out for an upgrade and expansion of its trail network and also received a brand new pump track, jump line and small skills park. The pump track area comprising of an intermediate pump track, […]

More Information »

Mt Remarkable, TrailScapes, Flinders Ranges Wacker Neuson Excavator trail building

Mount Remarkable Summit trail, South Australia

Client Department of Environment, Water and Natural Resources, SA

Date April 2015

TrailScapes recently designed and constructed a return trail approximately 2.2km long at the top of Mount Remarkable in Mount Remarkable National Park in April 2015. This alignment built through very challenging rocky terrain offers an alternative for hikers who previously had to follow a fire management road to the summit. […]

More Information »

Sturt Gorge Recreation Park, South Australia

Client Department of Environment, Water and Natural Resources

Date December 2014 - May 2015

The Sturt Gorge trails, a significant addition to the increasing network of singletracks in the Adelaide Hills comprises of 8 kilometres of multi-use trails for all levels of ability. The new network allows hikers and riders to link with the popular Craigburn Farm trails and Shepherds Hill Recreation Park’s trails whilst enjoying […]

More Information »

Royal National Park Berm Temptation Creek MTB trail

Royal National Park, Temptation Creek trail, Sydney

Client NSW Parks and Wildlife

Date June 2015

In June 2015, TrailScapes spent three weeks upgrading the Temptation Creek shared-use trail at Royal National Park. Works included the construction of a climbing line, re-instating drainage, repairing and installing rock armouring to eroded areas, improvements to corners and berms, etc.  

More Information »

Buxton MTB Park – Flow Trail, Victoria

Client VIC Parks

Date March 2015

TrailScapes was contracted to design and construct what turned out to be one of Australia’s most progressive Flow trail. The 2 km long addition to Buxton Mountain Bike Park, an hour and a half out of Melbourne is rated “Blue/Intermediate” and consists of a gentle climb and a long flowy descent incorporating log […]

More Information »

Bantry Bay (Garigal NP) Mountain bike trails, Sydney

Client NSW National Parks

Date April to November 2014

TrailScapes was chosen to carry out the highly-pivotal task of constructing the first new purpose-built mountain bike only trails in a National Park in NSW. Nestled in the middle of the Northern Beaches of Sydney, the site at Bantry Bay is a pristine, almost untouched part of Garigal National Park. […]

More Information »

Cobbler Creek Shared-use trails, South Australia

Client DEWNR - Department for Environment Water and Natural Resources, SA

Date 22 May - 22 December 2013

Following the success of the Craigburn Farm project, TrailScapes was awarded the contract to construct a network of shared-use trails within the Cobbler Creek Recreation Park. This project is used as a “testing ground” for the development of sustainable trails catering for walking and cycling access on Reserves of DEWNR […]

More Information »

Mawson Trail SA

Client Department for Recreation and Sport, SA

Date Ongoing

TrailScapes carries out maintenance to Australia’s longest bike trail, the 900kms long Mawson trail, which starts in Adelaide and finishes in Blinman in Outback South Australia. Our team makes sure signage is adequate and that the route is safe and clear for riders. If you like cycle-tourism, the Mawson trail should […]

More Information »

Craigburn Farm Shared Use Trails SA

Client Department of Environment and Natural Resources (DENR), SA

Date Stage 1: August - December 2011 / Stage 2: August 2012 - January 2013/ Stage 3: March 2013

The Craigburn Farm Shared-Use Trail Project is an initiative by the Department of Environment and Natural Resources (DENR) and was designed and constructed by TrailScapes Pty Ltd. The 15km trail network, which caters for experienced mountain bike riders, horse riders and hikers, has received international acclaim – having been heralded […]

More Information »

Eagle Mountain Bike Park SA

Client Department for Recreation and Sport, SA

Date Ongoing

TrailScapes were instrumental in the development of the Eagle Mountain Bike Park (EMBP) in South Australia; and thanks to their world-class design and construction, EMBP was awarded hosting of the Australian Mountain Bike Championships for three years running. The development of this 22km trail network involved construction of a UCI […]

More Information »

Willunga Pump Track SA

Client City of Onkaparinga

A combination of pump track, dirt jumps and BMX track at Wilunga in South Australia.

More Information »

Victor Harbor Heritage Trail SA

Client City of Victor Harbor

Date Stage 1: June - July 2011 / Stage 2: January - February 2012

TrailScapes constructed a section of the Heritage Trail in Victor Harbor, South Australia in two stages throughout 2011 and 2012. The first stage of this project involved the construction of a 900mm wide, full-bench trail with a small creek crossing. The construction took place through grass paddocks, with our team […]

More Information »

Livingstone National Park NSW

Client Department of Environment and Heritage, NSW

Date March - April 2012

TrailScapes constructed around 5km of new “green” (easy) shared-used trails in Livingstone National Park, New South Wales in 2012. This project was ground-breaking (literally and figuratively), as it was the first time that a new trail to accommodate mountain bikers was formally built in a NSW National Park. For this […]

More Information »

Morialta

Morialta Conservation Park SA

Client Department of Environment and Natural Resources (DENR) SA

Date Stage 1: May - June 2011 / Stage 2: October 2011

The creation of this 900 – 1200mm wide full-bench trail required construction through challenging terrain conditions, including thick olive groves, steep slopes and rocky outcrops. Morialta Conservation Park is an environmentally sensitive site, so TrailScapes provided special care and consideration throughout the design and construction process to ensure that there […]

More Information »