Wodonga Pump Track

Client City of Wodonga

Date February to March 2020


STAGE 1

In November 2019, our team won the tender to design a 2-stage asphalt pump track in Birallee Park, Wodonga for Wodonga Council (Victoria). The construction of Stage 1 was completed in March 2020 and took just under 5 weeks. This stage included the installation of drainage, the shaping of over 500T of local road base and the application of about 220square metres of asphalt as well as line painting. Artificial turf was installed in the interim until Stage 2, which will see the facility double in size, and will also include the installation of natural turf and other landscaping elements.

 